Affiliation: LAC, University of Illinois at Chicago
Figure 1: Optimal Production Level
for Manufacturing Stage 2
with 3 Operational Machines
* Note: The production levels are not admissable when they
are greater than 1 and are the result of unconstrained control.
Under constraints, the production level would be set to 1 and the
aggregate level should be adjusted to reflect the shortfall of production.